Our projects
North Shore Pool Defender Filtration System
Installation of variable frequency drive and control wiring for state of the art filtration system at an Olympic size pool in Saint Petersburg, FL
Brookdale Pinecrest 2nd 3rd 4th floor Renovations
Installation of new hallway lighting on 6 floors of assisted living facility in Largo, Florida.
See MoreUniversity Preparatory Academy
Installation of new 3 phase kitchen panel for new serving kitchen equipment.
See MoreBox Truck Generator Installation
Installation of generator and 3 phase electrical panel in a box truck to power a massive dry cleaner which cleans draperies and stage curtains on site at hotels and theaters throughout Florida.
See More1905 Bayfront Tower
Complete rewire and extensive renovation of 19th floor condo unit. We moved the electrical panel and installed circuits throughout the condo for everything from the cove lighting to the steam shower to the floor outlet for the player piano.
See MoreGenius Central
Renovation of warehouse space into office space for tech companies. Revamped electrical service providing 2 600 amp 3 phase services, all branch circuitry, and led lighting throughout. This was a design build project.
See MoreNorthwest Pool Pole Lighting
Installation of a total of 8 light poles around the pool perimeter and lighting controls to facilitate night swims. Light poles were 46 feet tall with fixtures installed per engineers spec.
Liv @ Dunedin
Remodel of 182 apartments. New kitchen circuitry, new washer and dryer circuit. Arc fault protection added for new devices. Smoke detectors added for life safety.
See MorePei Wei Restaurant 4th St Saint Pete
Ground up construction of new restaurant. Installation of electrical service, lighting, lighting controls throughout the restaurant.
The Pearl
Existing 32 unit apt. building consisting of 1,2 and 3 br apartments. Washers and dryers added into apts. which increased the electrical load to the units. We coordinated with the electrical engineer and managed to reutilize the existing feeder conduits on 17 of the units by changing over to larger copper feeders from the existing aluminum.
See More